
1 / 1
Basic Info
| Model No. | 50x50x90 |
|---|---|
| Shaping Mode | Injection Mould |
| Surface Finish Process | Polishing |
| Mould Cavity | Multi Cavity |
| Plastic Material | ABS |
| Process Combination Type | Single-Process Mode |
Product description
Full project control with high quality procedures
Hongzhun technology was established in 2009, concentrating its activity on mould construction & Injection Mold Inserts for the plastic injection industry. We are a specialized company in technical moulds, Insert Injection Molding & Mold Tool Inserts, able to respond to the most demanding deadlines, complex requirements and quality requisites. All the projects are entirely controlled by us, from moulds&mold components project concept up to part and mould&parts validation. A total of 90% of our moulds are exported to Europe, Japan and North American countries.
Hongzhun technology understands quality as a core value of the company, having implemented a Quality Management System based on ISO 9001:2008 demands.
With this system as a work tool, we`re able to ensure our customers that the final product is always manufactured in accordance to their requirements.
Hongzhun technology `s priority is the continuous satisfaction of the customer`s needs, counting with the commitment of its employees and its suppliers in the quality management system to achieve theses goals.
Process tolerance: +/-0.01mm
Manufacturing Lead time: 10 days
Delivery lead time: 3 days
Size: 50x50x90mm
Material: 1.2343
Hardness: 52+2 HRC
ISO 9001 certified
Mold components for injection mold
HS code: 84804100
Component making standard
1,All components must be making according to customer`s request by different color shown on 3D drawing to keep the correct tolerance .
2,All components must inspect at every process(every step) by CMM machine .
3, All components must engrave by marking machine,not by hands.
4,All components must chamfer by machine, not by hands.
5,All components must to be done by high speed CNC, mirror EDM,slow wire cutting .
6,All components must be clean before shipping.
7,All components can`t welding before get the approved from customer.
8,All components can`t be any delay.
9,All components must provide steel certificate.
Advanced equipment
Inspection Center
Send your inquiry to this supplier
You may also be interested in
Product Categories